LATEST HEADLINES
-
Southern Power Expands Millers Branch Solar Facility In Texas5/6/2024
Southern Power, a leading U.S. wholesale energy provider and subsidiary of Southern Company, today announced the expansion of its 29th solar project — Millers Branch Solar Facility. The Phase II expansion represents an additional 180-megawatts (MW) from the current Phase I 200 MW facility that is nearing the start of construction.
-
Nordex Group Receives Order For 148 MW For N149/5.X Turbines5/2/2024
The Nordex Group has received an order for N149/5.X turbines from the United States and will be supplying 25 of its Delta 4000 series models. The turbines will be installed with an 89m seismic tower at an undisclosed wind farm in California.
-
MN8 Energy Sources 457 MW Of American Solar Modules From First Solar5/1/2024
First Solar, Inc. (“First Solar”) announced that MN8 Energy LLC (“MN8”) has placed orders for 457 megawatts (MW) of advanced thin film solar modules, including 170 MW of Series 6 Plus bifacial modules and 287 MW of Series 7 modules. The modules will power projects in the northeastern and southern United States.
FEATURED PRODUCTS
Reliable, maintenance-free flow measurement with new hi-tech transmitter.
AGENDA ANNOUNCED FOR POWERPLANT CHEMISTRY FORUM
The preliminary agenda for the 2019 PowerPlant Chemistry Forum USA (PPCF) was announced on July 1. The Forum titled Power Cycle Chemistry in a Changing World will cover a variety of key issues facing plant chemists and decision makers including Fleet Flexibility, Corrosion Products, Film Forming Substances and other critical topics. SWAN Analytical USA is taking part, with Technical Director Randy Turner participating in the steering committee as well as presenting. PPCF takes place in Washington DC September 26-27.
ACROSS THE WIRE
-
Southern Power Expands Millers Branch Solar Facility In Texas5/6/2024
Southern Power, a leading U.S. wholesale energy provider and subsidiary of Southern Company, today announced the expansion of its 29th solar project — Millers Branch Solar Facility. The Phase II expansion represents an additional 180-megawatts (MW) from the current Phase I 200 MW facility that is nearing the start of construction.
-
MN8 Energy Sources 457 MW Of American Solar Modules From First Solar5/1/2024
First Solar, Inc. (“First Solar”) announced that MN8 Energy LLC (“MN8”) has placed orders for 457 megawatts (MW) of advanced thin film solar modules, including 170 MW of Series 6 Plus bifacial modules and 287 MW of Series 7 modules. The modules will power projects in the northeastern and southern United States.
-
Seven Corporate Buyers Enter Into Aggregation Deal To Purchase 180 MW Of Solar Energy Through The Net Zero Consortium For Buyers5/1/2024
Through Sustainability Roundtable, Inc.'s Net Zero Consortium for Buyers (NZCB), Cisco, Juniper Networks, Bio-Rad Laboratories, Cadence Design Systems, IDEXX Laboratories, Inc., PTC, and a large healthcare company signed an aggregated virtual power purchase agreement (VPPA) with Southern Power Company for the renewable energy credits produced by the 180 MW Phase II portion of the Millers Branch Solar Facility in Haskell County, Texas, expected to achieve commercial operation in the second quarter of 2026.
ATTENTION BOILER OWNERS
-
05.09.24 -- Nordex Group Receives Order For 148 MW For N149/5.X Turbines 05/09/24 Power Online Newsletter
-
Southern Power Expands Millers Branch Solar Facility In Texas
Southern Power, a leading U.S. wholesale energy provider and subsidiary of Southern Company, today announced the expansion of its 29th solar project — Millers Branch Solar Facility. The Phase II expansion represents an additional 180-megawatts (MW) from the current Phase I 200 MW facility that is nearing the start of construction.
-
05.02.24 -- Understanding Flow Meters And Their Pros And Cons 05/02/24 Power Online Newsletter
-
Nordex Group Receives Order For 148 MW For N149/5.X Turbines
The Nordex Group has received an order for N149/5.X turbines from the United States and will be supplying 25 of its Delta 4000 series models. The turbines will be installed with an 89m seismic tower at an undisclosed wind farm in California.
-
MN8 Energy Sources 457 MW Of American Solar Modules From First Solar
First Solar, Inc. (“First Solar”) announced that MN8 Energy LLC (“MN8”) has placed orders for 457 megawatts (MW) of advanced thin film solar modules, including 170 MW of Series 6 Plus bifacial modules and 287 MW of Series 7 modules. The modules will power projects in the northeastern and southern United States.
-
ORIX Begins Operation Of Minami-Kayabe Geothermal Power Plant, Japan's Largest Binary Cycle Geothermal Power Plant In Hokkaido
ORIX Corporation (“ORIX”) announced today that it has begun commercial operation of the Minami-Kayabe Geothermal Power Plant in the Minami-Kayabe region of Hakodate City, Hokkaido*1. The power plant has a generation capacity of 6,500 kW (6.5 MW), and is the largest*2 binary cycle geothermal power plant in Japan.