Case Study

Vung Ang 1 Coal Fired Plant, Vietnam

Source: Evoqua Water Technologies
Vung Ang 1 Coal Fired Plant, Vietnam

Project Details
​Project Name: Vung Ang 1 Coal Fired Plant, 2 x600 MW, Vietnam
Client: Torishima
Solution Type: Sea-to-plant intake system
Year: 2013
Capacity: 5 intake channels, each 47,520m3/h (209,225 gpm)

Challenge

The challenge at this coal fired nuclear power plant was to install a sea-to-plant water filter system. The purpose was to filter uninterrupted cooling water for the plant and to remove any encountered debris and prevent condenser blockage.