Technical Paper: High Pressure Feedwater Heater Restoration
In late 1988 and early 1989, two of the four high pressure feedwater heaters at each of the three generating units at the Tennessee Valley Authority's (TVA) Thomas H. Allen Fossil Plant were replaced. In the Fall of 1997, after 8½ years of service, a significant number of tubes failed suddenly in the two Allen unit 3 replacement heaters. Within a 14 month period, one of the unit 3 replacement heaters has 97 tube failures and the other had 171 failures. The mode of these tube failures was determined to be stress corrosion cracking (SCC) initiated at a tube roll transition located within the tubesheet. In order to prevent continued progression of tubing damage and to restore failed tubes to service, TVA employed CTI Industries to install stainless steel inserts in the inlet and outlet ends of each tube in the affected heaters.
This paper discusses the failures, investigative techniques, probable root causes, and corrective measures evaluated and implemented to extend the service life of high pressure feedwater heaters at TVA's Allen Fossil Plant.
Click "Download Now" to download the complete technical paper in pdf format.
access the Download!
Log In
Get unlimited access to:
Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue.
X
Enter your credentials below to log in. Not yet a member of Power Online? Subscribe today.
Subscribe to Power Online
X
Subscribe to Power Online