Case Study

Generating Station Maximizes Efficiency By Choosing A Membrane Decarbonation System

Source: 3M Separation and Purification Sciences Division
rokeby

When dissolved carbon dioxide in the water began overloading the anion resin and decreasing capacity at its Rokeby Generating Station, Lincoln Electric Systems had to act quickly to update its winter contingency plans and meet increasing demand. In this case study, learn why the municipality chose a membrane degasifying system over chemical treatment options or a forced draft aerator, thus reducing costs and improving overall efficiency by minimizing downtime.

3M Separation and Purification Sciences Division