Datasheet | September 10, 2010

Membrane Clean In Place

Source: Aquatech International Corporation

The CIP unit is designed for manual operation through a local control box on the skid. A chemical storage tank is mounted on its own stand and connected to the CIP skid with either hard PVC piping or quick disconnect fittings and flexible hoses. This gives the unit the ability to be mounted in a permanent location or totally portable if desired. The piping is schedule 80 PVC that is hydrostatically tested at the factory. The electrical enclosure is NEMA 12. All skid wiring is completed and tested before shipment.

VIEW THE DATASHEET!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Power Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to: