Case Study: Ovation Unit Response Optimizer Improves Plant Efficiency At Constellation Energy's Crane Station

Emerson Process Management, Power & Water Solutions
File Size: 563.2 KB   Estimated Download Time: < 1 min
Description

C.P. Crane Unit 2 experienced overfiring when ramping up to its full load megawatt target. This overfiring – which ranged from 80-100 degrees Fahrenheit over the operating temperature of 1050o F main steam and 1000o F reheat – was caused by the inherent lag time in the combustion and steam flow that is ultimately required for the unit to meet its target ramp rate and megawatt production.