Case Study

High Purity Boiler Water For Thermal Power Plant In Egypt

Source: Aquatech International Corporation

This facility is the Abu Qir Thermal Power Plant Units 6 & 7 with 2 x 650 MW Gas/Oil Fired Units.

The principal objective of this project was to provide environmental friendly energy with a reasonable price for the investment sector (Industrial, agricultural or commercial) as well as the household sector. This objective is in line with the Ministry of Electricity and Energy policy of providing electrical energy to all consumers in the Arab Republic of Egypt. The Project consists of two 650 MW Steam Generators, and two Steam Turbines, Condensers and auxiliaries, and switchyard, etc.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Power Online? Subscribe today.

Subscribe to Power Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Power Online