Case Study | March 27, 2013

High Purity Boiler Water For Thermal Power Plant In Egypt

Source: Aquatech International Corporation
ProjectProfile77

This facility is the Abu Qir Thermal Power Plant Units 6 & 7 with 2 x 650 MW Gas/Oil Fired Units.

The principal objective of this project was to provide environmental friendly energy with a reasonable price for the investment sector (Industrial, agricultural or commercial) as well as the household sector. This objective is in line with the Ministry of Electricity and Energy policy of providing electrical energy to all consumers in the Arab Republic of Egypt. The Project consists of two 650 MW Steam Generators, and two Steam Turbines, Condensers and auxiliaries, and switchyard, etc.