Case Study

Levelflex M FMP45 In Boiler Control

Levelflex M FMP45 mesures hot water in super heated steam boilers at public ultility plant.

Two transmitters are installed at each location for safety precautions but the transmitter readings did not normally agree. If the hot well goes dry, the boiler tubes can be damaged leading to shut downs, tube failure, and even catastrophic failures.

Endress+Hauser recommended 2 Levelflex M FMP45‘s with gas phase compensation, due to the presence of high pressure steam.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Power Online? Subscribe today.

Subscribe to Power Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Power Online