More News


Electromagnetic Flowmeter ProcessMaster FEP300
Electromagnetic Flowmeter ProcessMaster FEP300

The modular design of the ProcessMaster FEP300 standard version offers the industry's widest range of liners electrodes and sizes to meet the needs of even the most demanding process applications in sectors as diverse as chemical, power, oil & gas, pulp & paper and metals & mining.

More Featured Products


More Across The Wire


Emerson Process Management, Rosemount Analytical Emerson Process Management, Rosemount Analytical

Rosemount Analytical, one of Emerson’s leading process management companies, is the world’s premier supplier of technologies for combustion analysis, process analysis, liquid analysis, gas measurement, and emissions monitoring. With an 80-year legacy of manufacturing liquid and gas analytical products that have revolutionized the process industries, we continue to provide real, quantifiable analytical solutions.


  • EPA No Longer Accepting Paper Submittals

    EPA is no longer accepting paper submittals of the Notification of Compliance Status (NOCS) for Energy Assessments for area source boilers. We now require the NOCS to be submitted electronically to the Compliance and Emissions Data Reporting Interface (CEDRI). For further information, please see the implementation videos.

  • EPA And Industry Fail To Settle Waste Unit Risk Policy Fight

    The US Environmental Protection Agency (EPA) and industry groups including cement producers have failed to settle a permit dispute that is testing whether the agency has the authority to require operators of hazardous waste combustion units to conduct risk assessments that can be used to strengthen emissions limits for mercury and other pollutants when renewing the facilities' existing waste and air permits. Negotiations stalled during a meeting in November 2013 between EPA lawyers and cement kiln operators at EPA's Region V offices, according to an 8 January 2014 status report the parties filed with the Environmental Appeals Board (EAB). Litigation will continue on 20 February 2014.

  • EPA Publishes Final Boiler MACT And Other Rules - Compliance Dates Set

    On January 31, 2013, U.S. EPA published the final Boiler MACT in the Federal Register. This sets the existing source compliance date as January 31, 2016.

  • EPA Reopens Public Comment Period On Reconsideration Of Startup And Shutdown Provisions

    EPA is reopening, for 60 days, the public comment period on the startup and shutdown provisions included in the November 2012 proposed updates to pollution limits for new power plants under Mercury and Air Toxics Standards.

  • EPA Updates The Mercury And Air Toxics Standards For New Power Plants

    The Environmental Protection Agency (EPA) updated emission limits for new power plants under the Mercury and Air Toxics Standards (MATS). The updates only apply to future power plants; do not change the types of state-of-the-art pollution controls that they are expected to install; and will not significantly change costs or public health benefits of the rule.

  • EPA Finally Amends Its Boiler MACT Regulations And Further Defines Fuels Versus Wastes

    Boiler owners beware – EPA has “finalized” its Boiler MACT, GACT, CISWI and NHSM rules and the compliance clocks have begun ticking.

More For Boiler Owners


More Supplier News