South Korea consumes about 15 gigawatts of energy each year, half of which goes to the country's largest and most densely populated city, Seoul. With annual energy consumption growing at 8 percent, Korean power generators must take steps to maintain high levels of availability and reliability to maintain cost-effective production. The Yonghung Power Plant is part of KOSEP's strategy to maintain low-cost, high-quality electricity for Seoul's metropolitan area.